Before installing any roofing materials make sure that the roof deck is smooth properly fastened to the roof trusses dry and free of any gaps or holes.
Installing composition roofing.
The same results could have been achieved with an l shaped piece of wood to use as a positioning guide.
With a pneumatic nail gun the job goes a lot faster.
Where several workers are installing shingles one usually begins by installing shingles along the eave overhang while others begin filling in the field working from bottom to top.
Nail it every couple of feet.
It s kind of hard to see in this photo but the adjustable guide is set against the lower edge of the previous.
Use a tin snips to cut the drip edge to size.
Install the drip edge on the gable ends of the roof after you finish installing your underlayment.
You can install metal valley flashing but it is common to simply apply an 18 inch wide strip of roll roofing instead.
Make sure the shingle overhangs the eave edge by 1 2 inch along the entire starter row.
Having a clean flat deck surface will help ensure that the newly shingled roof will likewise appear smooth and flat when finished.
Shingles long roofing nails roofing cement and flashings firstly prepare the roof by installing underlay drip edge and valley flashing.
This second row will go directly over the first row.
But the similarity stops there.
Start at the bottom side of the gable and overlap the sections of drip edge a few inches as you work your way up the roof see figure a.
Some roofers will use 15 pound 6 8 kg roofing paper which is an effective method although the best method is a self sealing membrane with a rain screen.
Load the roof preferably with a boom with the shingles whille being careful not to allow them slide downwards.
The conventional way of roofing a house is with individual composite asphalt shingles.
Begin at the bottom left corner of a roof surface and work toward the right and upward from the eave line to the peak.
Lay asphalt felt paper or special waterproof underlayment such as a self healing membrane over the roof.
Step 4 place the second layer of composite roofing shingles.
Rolled msr roofing is thinner larger cheaper less durable and is horizontally installed in long strips.
Install drip edge flashings roofing felt and wsu if needed.
Install material on the other side of the roof.
This allows accurate positioning of the shingle before nailing it.
Rolled roofing is vaguely similar in that it is also an oil based asphalt product.
Use four roofing nails per shingle.
Finish off by laying a row of roofing over the peak that overlaps the roofing on both sides of the roof and gluing and nailing it.
Most roofing nail guns have an adjustable guide on the bottom.
Put the nails only 3 inches above the eave.